Page 6: Frame Almost Done
October 2000

Back Next
The air tunnel is complete! Air enters under the nose of the car (front of picture) and is channeled into the passenger compartment. The first path is for the heater and the second/final path is for fresh air. A mesh screen will be tacked over the opening to keep out rocks and leaves.
Another shot of the tunnel. Note extra flanges everywhere.
Scott with the floor section that is welded over (under?) the tunnel.
The entire rear frame around the engine has been continuously welded to increase strength and rigidity. (The factory stitch welded the frame.)
Back Next